Finishing up the baggage area

Hours Worked = 1.5

At least the baggage area portion of the plans.

I put in some insulation behind the side wall and riveted it in place. I also riveted in the baggage door jamb that had needed some touch up primer and I installed the last few nutplates that needed to go in.

Finally, I riveted in the wear strips that protect the seat belt cables as they pass thru the rear baggage bulkhead.

IMG_0693.JPGIMG_0692.JPGIMG_0691.JPG