Baggage Door 1 June 9, 2013June 23, 2013 Ed 0 Comment Baggage Door, Fuselage, RV10 Build The baggage door is a pretty simple structure. It’s a c channel frame sandwiched by two aluminum skins. So tonight, I was able to get Read more
Priming June 16, 2013June 23, 2013 Ed 0 Comment Baggage Door, Fuselage, RV10 Build Spent a few hours priming the baggage door parts and remaining baggage area parts. Read more
Baggage Door Riveting June 17, 2013June 23, 2013 Ed 0 Comment Baggage Door, Fuselage, RV10 Build The baggage door (minus the inner skin) is now all riveted together! Read more
Baggage Door hinge install June 18, 2013June 23, 2013 Ed 0 Comment Baggage Door, Fuselage, RV10 Build After gluing in some insulation and riveting on the inner door skin, it was time to line up the door in the frame and drill Read more
Door hinge, revisited June 19, 2013June 23, 2013 Ed 0 Comment Baggage Door, Fuselage, RV10 Build After thinking about it for a bit, I decided that if I’m building an airplane, I’m going to do it right! I just didn’t like Read more
Finishing the baggage door June 26, 2013July 7, 2013 Ed 5 Comments Baggage Door, Fuselage, RV10 Build Since I had decided to redo the baggage hinge earlier, I needed to wait to install the door permanently until I was able to prime Read more