Just got all the baggage area parts primed up.
Category: RV10 Build
Under floor stuff
Baggage Area Riveting
Baggage Area Walls
Again, another pretty straight forward day. Today, I riveted in place parts of the frame around the baggage door opening, and a side wall panel.
Baggage Door 1
The baggage door is a pretty simple structure. It’s a c channel frame sandwiched by two aluminum skins. So tonight, I was able to get
Priming
Spent a few hours priming the baggage door parts and remaining baggage area parts.
Finishing up the baggage area
Baggage Door Riveting
The baggage door (minus the inner skin) is now all riveted together!
Baggage Door hinge install
After gluing in some insulation and riveting on the inner door skin, it was time to line up the door in the frame and drill
Door hinge, revisited
After thinking about it for a bit, I decided that if I’m building an airplane, I’m going to do it right! I just didn’t like
