Instead of the stock RV10 rudder pedal system that looks like this: I chose to purchase a set of rudder pedals from a company called
Category: Fuselage
Pedals bolted in
Finishing fuel lines
The last bit of fuel line work I needed to do was the straight pieces that connect the fittings at the tunnel to the fittings
Control work
With all the control parts primed, I started by riveting the end caps into the long control pushrods. Then I screwed in the rod end
Finishing up the controls… for now
Flaps
Flap system, part 2
Just a short night. I got the flap rods, flap arms, and bearing blocks all bolted in.
