All that was left on the flap system was to cut up some brass tubing into spacers, and bolt in the flap motor. I also
Flap system, part 2
Just a short night. I got the flap rods, flap arms, and bearing blocks all bolted in.
Flaps
Finishing up the controls… for now
Control work
With all the control parts primed, I started by riveting the end caps into the long control pushrods. Then I screwed in the rod end
Sorry for the delay!
Finishing fuel lines
The last bit of fuel line work I needed to do was the straight pieces that connect the fittings at the tunnel to the fittings

