At least the baggage area portion of the plans. I put in some insulation behind the side wall and riveted it in place. I also
Author: Ed
Priming
Spent a few hours priming the baggage door parts and remaining baggage area parts.
Landscaping
Baggage Door 1
The baggage door is a pretty simple structure. It’s a c channel frame sandwiched by two aluminum skins. So tonight, I was able to get
Baggage Area Walls
Again, another pretty straight forward day. Today, I riveted in place parts of the frame around the baggage door opening, and a side wall panel.
Baggage Area Riveting
Under floor stuff
Comm Antenna Mounts Mounted
Parts Primed
Just got all the baggage area parts primed up.
Dimpling
All the baggage area parts were dimpled tonight. This section has some of the most detailed instructions on dimpling, as many parts have lots of
