Yup. Two posts in dedicated to the same day. I’m breaking today into two posts because I worked on two totally different sections of the
Category: RV10 Build
Cutting holes
Duckworks landing lights, Continued
Duckworks landing lights, part 3
Duckworks, part 4
Lens fitting and AOA install
AFS AOA Install, leading edge attach
Leading attach, continued
The other day, I was able to begin attaching the leading edge to the wing. I was able to get all of the lower attach
Attaching the other leading edge
Same as before, but we did it all in one night this time! And with that, the leading edge section is done. This section took
Fuel tanks!
The fuel tanks begin just like most other sections… with a whole lot of edge deburring! There were also some stiffeners and brackets to cut
