Tonight, I fabbed up a bunch of stiffeners that will give support to the baggage floor. These had to be cut from larger piece of
Category: Fuselage
Starting the steps, and they’re done!
Step Access Panels
Deburring
Tonight, I got all the baggage area parts (up to this point) deburred.
Dimpling
All the baggage area parts were dimpled tonight. This section has some of the most detailed instructions on dimpling, as many parts have lots of
Parts Primed
Just got all the baggage area parts primed up.
Under floor stuff
Baggage Area Riveting
Baggage Area Walls
Again, another pretty straight forward day. Today, I riveted in place parts of the frame around the baggage door opening, and a side wall panel.
Baggage Door 1
The baggage door is a pretty simple structure. It’s a c channel frame sandwiched by two aluminum skins. So tonight, I was able to get


