The capacitive sensor plates are all installed and wired. Electrical continuity has been verified between the two plates and the center conductor of the connector,
Last tank rib and fuel sensors
Aft inboard rib riveting
Just a little bit of time to work on the plane today. Got one of the aft inboard tank ribs riveted in place.
Fuel vents, aft inboard ribs
Got the fuel vents fabricated and the inboard aft ribs sealed in place.
Tank attach brackets riveted and sealed
After a few days away from the plane, I came back tonight and got the tank attach brackets riveted in place and sealed up. I
Tank attach brackets sealed in place
Right J Channel Riveted
Repeat of last night, with the other tank:
Left J Channel Riveted
Got the left tank j-channel stiffener all riveted in and sealed.
Tank J-Channel
Finished tank rib riveting
Finally finished riveting and sealing in the tank ribs.
