Again, another pretty straight forward day. Today, I riveted in place parts of the frame around the baggage door opening, and a side wall panel. I also drilled and riveted in place a whole lot of nut plates that will attach the back baggage wall to the plane.
Baggage Area Walls
Hours Worked = 4
