Today, I got the baggage area floor parts riveted together, then the floors riveted into the plane. The only gotcha I found was that I hadn’t dimpled the outer most baggage floor rib. It was a little tricky getting in there with the dimpling tools, but it all worked out in the end.
Baggage Area Riveting
Hours Worked = 4.75
