With completed bulkheads, I started the next section of the plans which includes all the ribs that make up the floor and seat structure.
First, I worked on the seat belt attachment anchors and the ribs that outline the sides of the rear seat foot wells. Then, I built the brackets where the flap motor will be attached in the center tunnel.
And after all that, I called it a night after almost 11 hours!
Like I mentioned in the last post, this video covers the entire day.
