Finished riveting up the left baffle, and then continued on the same as the other day, but with the right tank.
Right tank baffle
Hours Worked = 5.5
One average family living on the fly
Finished riveting up the left baffle, and then continued on the same as the other day, but with the right tank.
Comments are closed.
Is all that metalwork hard on your hands…cuts, scrapes and abrasions….what’s the temp in the workspace? Is the metal cold and hard to work with?
It’s not too bad. I always seem to get cuts on my hands from various projects around the house and working on cars, and the plane is no different. I do notice that my hands get sore when I use the cleco pliers a lot, but that’s what I get for being too lazy to get the air cleco gun out.
As for temperature, my garage is well insulated, and I have a big heater out there. I normally crank it up into the mid 60’s when I’m going to be out there for more than 15 minutes or so.