Mid cabin deck plates

Hours Worked = 2

Tonight, I started by doing some countersinking on the mid-cabin deck plates. These make up the structure of the bottom of the door. They were then placed on the plane, and match drilled to the longerons. I then match drilled the baggage door spacers and doublers, and the angles that will support the baggage area floor against the side skins.

Finally, I clecoed the mid fuse skins in place inĀ preparationĀ for match drilling.

Leave a Reply

Your email address will not be published. Required fields are marked *