Control work

Hours Worked = 2.25

With all the control parts primed, I started by riveting the end caps into the long control pushrods. Then I screwed in the rod end bearings, and set them close to the specs called for in the manual. Next I riveted up the idler arm that will connect the front and mid pushrods. Finally, I bolted in the control column.

Leave a Reply

Your email address will not be published. Required fields are marked *