Control systems work

Hours Worked = 4.5

It’s time to begin fabbing up the main flight controls.

I began by cutting pushrods to length and match drilling in the pushrod endcaps. I also drilled the control sticks to the bases. And finally, I test fit the control column, the control stick bases, and the control sticks in the fuse.

IMG_0813.JPGIMG_0812.JPG

Leave a Reply

Your email address will not be published. Required fields are marked *