Center tunnel ribs

Hours Worked = 1.5

With the firewall itself basically complete, it is time to start on the center tunnel extension. This is part of the firewall section because it is attached with the big beefy steel plates that support the nose gear to the firewall.

Tonight was pretty much just clecoing everything in place and match drilling. There was a little fiddling with one of the pieces of angle aluminum on the tunnel ribs that straddle one of the cross bars on the firewall, but it was nothing a little filing couldn’t take care of.

Leave a Reply

Your email address will not be published. Required fields are marked *