Alt Air and FAB Nose Trimming

Hours Worked = 2

I got two things done today.

First, I finished the construction of the Alternate Air Door. This consisted of trimming the fiberglass runners I constructed yesterday, riveting a piece of angle on the alt air door, and making sure everything slides nicely. There will be a lot of pressure on this door if it actually needs to be used, so the system needs to move freely and be pretty robust.

IMG_3353.JPGIMG_3354.JPGIMG_3355.JPGIMG_3356.JPGIMG_3357.JPGIMG_3352.JPG

The second accomplishment was the trimming of the airbox snorkle. It was a little too long, and was interfering with the lower cowl. It needed to be trimmed down a few inches, but now it’s very close to where it needs to be.